Minister of Power Gamini Lokuge hints power cuts will not be required in the coming days unless due to an emergency situation.
Speaking to media in Colombo today, Minister Lokuge said the Norochcholai Power Plant will also be fully operational in the next few days.
The Minister said he expects the coal power plant which generates 300MW of power will be fully operational by the 25th or 26th of this month.
Minister Gamini Lokuge said therefore he does not believe power cuts will be required in future.
